Saint Hill, Turner's Hill

> <

Project Type: Commercial Design and Installation

Duration: 6 months

This local project as a renovated castle that needed air conditioning to be designed and installed from the ground up to ensure that the system was fit for purpose. It required 2 large AHU systems and 20 VIRV systems. The products were discreetly placed in the castle's roof in so that it remains virtually invisible.